Burton · issues
Civic issues
Topics getting the most attention in Burton public meetings, ranked by how frequently they come up.
Hemp Hill and Saginaw Street land survey
A survey of property at Hemp Hill and Saginaw Street is nearly complete, with a topographic drawing showing buildings and a proposed split, but legal descriptions haven't been delivered yet. The board is waiting on those before moving forward.
Fire-damaged house rebuild timeline at 6254 Mercury
An owner whose house burned in May got council approval to demolish and rebuild, on a strict clock: demo permit in 10 days, demo done in 30 days, building permit filed 30 days after that — or the city tears down the garage and fence too.
DSB Golf property purchase
The city is buying property from DSB Golf and paying a good-faith deposit, but details weren't spelled out publicly and one council member voted no. Residents asked what's being bought, where, and why.
RxKids program for new and expecting families
RxKids gives pregnant moms and babies cash support with no strings attached — Burton families can now apply online, and 12 local families have already enrolled.
Veteran housing duplex on Davison Road
A veteran applicant won unanimous approval to build one duplex on a vacant R-1A parcel beside attached condos, saying the units will house veterans. A possible golf course easement still needs checking through the county register of deeds.
Davison Road gas station redevelopment
The long-vacant former Chase Bank at 4154 Davison Road will become a gas station with a convenience store and drive-through restaurant, with a new sidewalk required along Davison Road.
Concrete batch plant on Kleinpell Street
A small ready-mix concrete batch plant is coming to an existing trucking site on Kleinpell Street, about 300 feet from homes. Residents worried about silica dust and noise, so the approval requires hard-surfaced (poured concrete) truck areas to keep dust down.
Tim Hortons drive-thru at Center and Bristol Roads
Adding a drive-thru to the approved gas station/convenience store site locked in the Tim Hortons franchise deal. Expect construction to move ahead at the corner of Bristol and Center Roads, with pumps reoriented and the dumpster relocated.
Unapproved building materials at new Saginaw Street gas station
The builder of a new gas station at 4523 S. Saginaw Street put up cinder block instead of the approved split-face block. The city may issue a stop work order if the owner doesn't clarify whether he plans a veneer.
Murphy USA fuel center on North Belsay Road
Murphy Oil USA won unanimous approval for a 2,824-square-foot fuel center and convenience store near Court and Belsay, adding to Burton's crowded gas-station landscape. Conditions cover drainage permits, EGLE tank compliance, and sign review.